XoNeX™ is a proposed new approach to AI infrastructure that brings architecture, public art, and responsible thermal-management design together. Conceived by Chris Fox, the project envisions distinctive landmarks shaped by their host cities. Concepts shown are artist renditions; technical performance and commercial deployment remain subject to validation.

Discuss Investment & Strategic Partnerships
Barcelona XoNeX architectural rendition showing an underground museum surrounding a secured computing area
The underground museum · Barcelona study

A cultural destination below the plaza.

Selected larger XoNeX™ concepts envision a cultural venue alongside the proposed below-ground infrastructure. Museum programming, access, safety, and construction would be developed with local partners and subject to site-specific review.

The mission

Built around the host city.

XoNeX™ is an architectural and technology concept seeking qualified development partners. Each possible site would require engineering studies, regulatory review, independent performance evaluation and commercial planning before construction.

City-first architecture

Designs respond to their local setting, cultural character and public realm.

Research and validation

Environmental, technical and economic claims will be evaluated through site-specific research and testing.

Cultural opportunities

Where appropriate, public exhibition spaces and collaborations with local artists could be explored.

Mathematical projections · exploratory scenarios · not verified performance

What could XoNeX™ look like at scale?

Explore four independent architectural size families alongside five widely used cooling approaches. Change the sliders to model annual cooling electricity, on-site water use, estimated utility cost and photovoltaic electricity offsets. The arithmetic updates immediately for XoNeX™ and every contender, using the same proposed IT workloads and financial assumptions.

Important disclosure: All cooling COP and water-intensity values below are chosen mathematical assumptions, not field measurements, commercial bids, published company benchmarks, proof of energy or water savings, or predictions of achievable XoNeX™ performance. No XoNeX™ cooling rating or savings has been validated. Actual site conditions, cooling-system boundaries, auxiliary loads, electricity generation, water treatment, and life-cycle impacts require independent testing.

Shared scenario assumptions

These controls apply to all four structure sizes. Change any value to update every comparison below.

View scenario benchmark assumptions and equations

Five comparison archetypes, not a verified ranking or named vendor performance claims. Assumed cooling COP (useful cooling ÷ cooling electrical energy) and on-site water intensity (liters per kWh of modeled IT heat) are illustrative inputs to the arithmetic, not representative industry-wide values.

Modeled approachAssumed COPAssumed site water (L/kWh)
Air-cooled mechanical chiller3.00.03
Water-cooled chiller5.01.60
Direct evaporative assist8.01.40
Direct-to-chip liquid cooling6.00.50
Immersion-based cooling7.00.25

Equations: average IT heat (kW) = structures × racks/structure × assumed rack load (kW) × average IT load factor. Annual rejected IT heat (kWh) = average IT heat × yearly operating hours. Modeled cooling electricity (kWh) = annual IT heat ÷ assumed COP. Modeled water (liters) = annual IT heat × assumed water intensity (L/kWh). Annual cooling utility expense (USD) = cooling electricity × $/kWh + water (liters) ÷ 1,000 × $/m³. Savings versus a contender = contender modeled use or cost minus XoNeX modeled use or cost. These exclude server IT electricity, distribution overhead, capital costs, maintenance, land and museum operations, water supply-chain impacts, and revenue; different approaches can have different physical boundaries in practice. This calculator is not a total facility PUE or return-on-investment estimate.

Photovoltaic modeling assumptions: Each size has its own 5–150 panel slider. Five panels is a hypothetical nameplate-capacity equivalent for the disclosed circumferential toroidal PV band, not a physical band panel count. Additional panels represent optional PV installations. Solar generation = panels × structures × 0.420 kW × 4 equivalent full-sun hours/day × 365 days × 0.80 performance ratio. Net grid cooling electricity = gross cooling electricity minus the lesser of solar generation and gross cooling demand. Solar dollar offset = credited kWh × electricity price. This simplified annual offset ignores hourly generation/load mismatches, storage, export and tariff restrictions. Gross cooling COP and PUE are unchanged. Competing methods are modeled without equivalent solar, so PV-adjusted comparisons do not measure relative cooling efficiency.

Four structure-by-structure scenarios

Each structure size has its own sliders. Larger ring diameter alone does not imply a higher COP or greater verified efficiency: the modeled rack count and user-selected loads are the scaling assumptions.

Architectural concept · 10 ft

10-foot XoNeX™ scenario

8 modeled racks per structure · hypothetical scenario only; actual quantity may be higher or lower. Assumed IT load for modeling only: 140 kW per AI rack at full workload. Rack quantities and IT loads are illustrative assumptions, not established cooling ratings, construction specifications, deployed configurations, or verified performance results.

10 structures
Installed solar capacity—
Estimated annual solar generation—
Estimated grid cooling electricity after PV—
Estimated annual PV electricity cost offset—
Estimated facility PUE (illustrative)—
Modeled IT heat load0 MW
XoNeX modeled cooling electricity0 MWh/yr
XoNeX modeled on-site water0 m³/yr
XoNeX modeled utility spending after PV$0/yr
Five contender cooling approaches compared with XoNeX™ · all values are conditional models
Cooling approachGrid cooling electricity
MWh/year
Water use
m³/year
Annual utility cost
USD
Grid electricity difference vs XoNeX
MWh/year
Water difference vs XoNeX
m³/year
Cost difference vs XoNeX
USD/year

Positive differences indicate hypothetical grid electricity or utility-cost differences after XoNeX solar offset (competitors modeled without on-site solar); negative values indicate XoNeX would use or cost more under these assumptions. These are not comparative test results or manufacturer specifications.

Architectural concept · 20 ft

20-foot XoNeX™ scenario

16 modeled racks per structure · hypothetical scenario only; actual quantity may be higher or lower. Assumed IT load for modeling only: 140 kW per AI rack at full workload. Rack quantities and IT loads are illustrative assumptions, not established cooling ratings, construction specifications, deployed configurations, or verified performance results.

10 structures
Installed solar capacity—
Estimated annual solar generation—
Estimated grid cooling electricity after PV—
Estimated annual PV electricity cost offset—
Estimated facility PUE (illustrative)—
Modeled IT heat load0 MW
XoNeX modeled cooling electricity0 MWh/yr
XoNeX modeled on-site water0 m³/yr
XoNeX modeled utility spending after PV$0/yr
Five contender cooling approaches compared with XoNeX™ · all values are conditional models
Cooling approachGrid cooling electricity
MWh/year
Water use
m³/year
Annual utility cost
USD
Grid electricity difference vs XoNeX
MWh/year
Water difference vs XoNeX
m³/year
Cost difference vs XoNeX
USD/year

Positive differences indicate hypothetical grid electricity or utility-cost differences after XoNeX solar offset (competitors modeled without on-site solar); negative values indicate XoNeX would use or cost more under these assumptions. These are not comparative test results or manufacturer specifications.

Architectural concept · 40 ft

40-foot XoNeX™ scenario

32 modeled racks per structure · hypothetical scenario only; actual quantity may be higher or lower. Assumed IT load for modeling only: 140 kW per AI rack at full workload. Rack quantities and IT loads are illustrative assumptions, not established cooling ratings, construction specifications, deployed configurations, or verified performance results.

10 structures
Installed solar capacity—
Estimated annual solar generation—
Estimated grid cooling electricity after PV—
Estimated annual PV electricity cost offset—
Estimated facility PUE (illustrative)—
Modeled IT heat load0 MW
XoNeX modeled cooling electricity0 MWh/yr
XoNeX modeled on-site water0 m³/yr
XoNeX modeled utility spending after PV$0/yr
Five contender cooling approaches compared with XoNeX™ · all values are conditional models
Cooling approachGrid cooling electricity
MWh/year
Water use
m³/year
Annual utility cost
USD
Grid electricity difference vs XoNeX
MWh/year
Water difference vs XoNeX
m³/year
Cost difference vs XoNeX
USD/year

Positive differences indicate hypothetical grid electricity or utility-cost differences after XoNeX solar offset (competitors modeled without on-site solar); negative values indicate XoNeX would use or cost more under these assumptions. These are not comparative test results or manufacturer specifications.

Architectural concept · 60 ft

60-foot XoNeX™ scenario

48 modeled racks per structure · hypothetical scenario only; actual quantity may be higher or lower. Assumed IT load for modeling only: 140 kW per AI rack at full workload. Rack quantities and IT loads are illustrative assumptions, not established cooling ratings, construction specifications, deployed configurations, or verified performance results.

10 structures
Installed solar capacity—
Estimated annual solar generation—
Estimated grid cooling electricity after PV—
Estimated annual PV electricity cost offset—
Estimated facility PUE (illustrative)—
Modeled IT heat load0 MW
XoNeX modeled cooling electricity0 MWh/yr
XoNeX modeled on-site water0 m³/yr
XoNeX modeled utility spending after PV$0/yr
Five contender cooling approaches compared with XoNeX™ · all values are conditional models
Cooling approachGrid cooling electricity
MWh/year
Water use
m³/year
Annual utility cost
USD
Grid electricity difference vs XoNeX
MWh/year
Water difference vs XoNeX
m³/year
Cost difference vs XoNeX
USD/year

Positive differences indicate hypothetical grid electricity or utility-cost differences after XoNeX solar offset (competitors modeled without on-site solar); negative values indicate XoNeX would use or cost more under these assumptions. These are not comparative test results or manufacturer specifications.

Estimated PUE methodology: PUE = (IT electricity + cooling electricity + other facility electricity) ÷ IT electricity. This simplified scenario assumes IT electrical power is converted to heat, cooling electricity equals IT heat divided by selected COP, and other facility electricity is fixed at 5% of IT electricity. Thus estimated PUE = 1 + (1 ÷ selected COP) + 0.05. The 5% is a modeling assumption, not a measured XoNeX value. Actual facility PUE also depends on pumps, fans, power conversion, controls, operating conditions, and measurement boundaries. No XoNeX PUE has been verified.

Investor & strategic partnerships

Help shape the next landmark.

We welcome introductions from qualified investors, AI infrastructure partners, research organizations, developers, cities and cultural institutions interested in evaluating the XoNeX™ concept. Technical discussions and supporting materials are handled privately and, where appropriate, under a separate confidentiality agreement.

Contact for Investment & Partnerships

Concept-stage project. No offer of securities, guarantee of investment returns, or claim of independently verified performance is made on this website.

2025 Reported Industry PUE Benchmarks and XoNeX Projected Target

Five major data center operators with publicly reported 2025 power usage effectiveness (PUE) values. These are operator-reported historical figures, not independently verified by XoNeX and not a ranking of the five largest operators.

OperatorReported PUEReporting periodPrimary source
Meta1.08Calendar 2025Official source
Google1.09Calendar 2025Official source
Amazon Web Services (AWS)1.14Calendar 2025Official source
Microsoft1.17Fiscal 2025 (July 2024–June 2025)Official source
Equinix1.37Calendar 2025Official source
XoNeX™ (proposed)1.20 (projected, unverified)Illustrative design target, not a 2025 measurementConditional model; no operational measurement

XoNeX PUE disclosure: 1.20 is an illustrative design target, not a measured or independently validated PUE. Reported industry values and this conditional projection are not directly comparable performance results. Actual XoNeX PUE requires complete electrical-load accounting and independent testing.

Methodology and limitations: PUE = total data center facility energy / IT equipment energy. Lower PUE indicates less facility overhead. PUE is not cooling coefficient of performance (COP), and these figures cannot be substituted for cooling COP values. Operator boundaries, facilities, geographic mix, and reporting periods differ; figures are not strictly apples-to-apples. The published values are attributable to the named operators, but XoNeX has not independently audited them. The XoNeX calculator remains hypothetical, with no measured or established XoNeX COP, PUE, savings, or performance superiority. Company names are informational only and imply no endorsement or affiliation.